Can a Single Drone Flight Capture Both LiDAR and Thermal Data at the Same Time?

  • Writer: Harlon Mark
    Harlon Mark
  • Aug 7
  • 2 min read

No, on a standard current-generation drone platform, LiDAR and radiometric thermal are typically separate sensor payloads that aren't flown simultaneously on the same aircraft. A project that needs both data types on the same asset generally requires two separate flights rather than one combined pass, and that's worth knowing before a project timeline gets scoped, not after.


Why LiDAR and Thermal Are Separate Payloads

LiDAR and radiometric thermal sensors are distinct pieces of hardware, each with their own weight, power, and mounting requirements. On most drone platforms, a single flight carries one primary sensor payload at a time, meaning a LiDAR survey and a thermal survey of the same site are typically two separate missions, flown on their own schedules, even if they're scoped as part of the same overall project.


Why It Matters

For a project that genuinely needs both, say, a mining site wanting both stockpile volumetrics and equipment thermal inspection, or a bridge project wanting both LiDAR deformation monitoring and thermal delamination screening, this affects both timeline and cost. Two flights means two mobilizations, which should be reflected in project scoping from the start rather than discovered partway through. It's a small operational detail, but one that avoids a client being surprised mid-project by a schedule or cost implication that could have been planned for upfront.


Limitations

This is a hardware and platform limitation as of current-generation drone payloads generally, not something specific to any one provider, worth confirming directly with any provider being evaluated for a project needing both sensor types. Flight sequencing (which sensor flies first, how much time separates the two passes) can also matter for some applications, particularly where conditions between flights (lighting, temperature, activity on site) affect data comparability. Providers vary in how they schedule and price multi-sensor projects, so this is worth discussing explicitly during project scoping.